Large Power Transformers

STD Transformer’s large power transformer portfolio is being developed for high-voltage substations, power generation facilities and major industrial installations. The planned manufacturing capability covers ratings of up to 250 MVA and voltage levels of up to 400 kV. Each transformer is specified around the electrical requirements of the network, the conditions at the installation site and the constraints of transport and handling.

ParameterConfiguration
Planned maximum rated powerUp to 250 MVA
Planned maximum voltage levelUp to 400 kV
Cooling typesONAN / ONAF / OFAF, as applicable
Tap changer optionsOn-load tap changer (OLTC) or off-circuit tap changer (OCTC), as applicable
Applicable standardsIEC 60076 series
TestingRoutine, type and special tests as specified

The stated values describe the planned portfolio limits. The combination of power rating, voltage level and cooling arrangement is confirmed for each project

Design and Configuration

Large power transformers are designed around the role they will perform in the power system. A generator step-up transformer is specified to match the generator output and grid connection requirements. A transformer connecting two networks is specified around their respective voltages, the required power transfer and the impedance defined by the system study.

Core and winding design, insulation coordination and terminal arrangements are developed together. Where a project specifies guaranteed losses, impedance or sound levels, those values form part of the design and review process. Protection and monitoring accessories can also be specified to suit the substation’s control and protection requirements.

The mechanical design accounts for the location of bushings, cooling equipment and accessories, along with access for inspection and servicing. Transport dimensions and shipping weight are considered early, particularly where road limits, lifting capacity or restricted access could affect delivery and installation. For replacement projects, the existing bay dimensions and connection positions help define the new unit’s layout.

Cooling and Voltage Regulation

The cooling arrangement is selected according to the transformer rating, expected load profile and site conditions. ONAN uses natural oil circulation and natural airflow. ONAF combines natural oil circulation with forced airflow. OFAF uses forced oil circulation and forced airflow. Where more than one cooling stage is specified, the project datasheet sets out the rating associated with each stage.

An on-load tap changer allows the voltage ratio to be adjusted while the transformer remains in service. An off-circuit tap changer allows adjustment with the transformer de-energised. The choice depends on how the network regulates voltage and how often the ratio needs to change. The tap range, step size and control requirements are agreed as part of the technical specification.

Applications

  • Transmission substations. Large power transformers connect high-voltage and extra-high-voltage networks at different voltage levels. The transformer’s rating, impedance and voltage regulation are coordinated with the substation and the wider grid.
  • Power generation and renewable energy. Generator step-up and grid connection transformers raise the voltage from a generating plant or a renewable energy collector network to the level required at the point of connection.
  • Grid reinforcement and interconnection. New or replacement units can increase transfer capacity or connect networks. Existing bay geometry, connection positions and outage constraints can influence the design.
  • Major industrial installations. Large power transformers can serve facilities with high electrical demand. The specification reflects the plant load profile, supply voltage and interface with the site’s electrical infrastructure.

Testing and Documentation

The test programme is defined in accordance with the applicable parts of the IEC 60076 series and the agreed project specification. Routine tests form the basis of factory verification. Type and special tests are included as specified for the project. Purchasers can identify witnessed tests or additional reporting requirements during the technical review.

The project datasheet records the agreed electrical ratings and selected options. The general arrangement drawing identifies overall dimensions, terminal positions and accessory locations so that the project team can review the transformer against the substation layout. Factory test reports document the results of the agreed tests.

Frequently Asked Questions

The planned manufacturing capability is up to 250 MVA and up to 400 kV. The available combination of rated power, voltage and cooling is confirmed during technical review.

 

Yes. The design can be reviewed against the existing foundation and bay dimensions, terminal positions and clearances. Existing drawings and transport restrictions help define the scope.

The planned portfolio includes ONAN, ONAF and OFAF cooling, with on-load or off-circuit tap changer options as applicable. The required configuration is agreed for each project.

 

Share the required MVA rating, winding voltages, frequency, vector group, impedance and any specified loss limits. Include the preferred cooling and tap changer arrangement, site drawings, transport constraints and requested tests where available.

 

Get contact

Want to know more?

For detailed specifications and performance information, please contact us. Our engineering team is ready to support you with your project-specific requirements.